|

|
1.
|
Zoning
|
|
Assist Owner in obtaining required zoning approvals or
variances.
|
|

|
2.
|
Space Needs
|
|
Interview the proper personnel needed for developing the
square footage requirement.
|
|

|
3.
|
Property Survey
|
|
Survey of property, including suggested grades.
(Construction area only)
|
|

|
4.
|
Sub Surface Soil Exploration
|
|
Actual soils borings or surface excavations to determine
soil suitability.
|
|

|
5.
|
Plot Plan Design
|
|
Design the proposed location of the building, the
parking lot and green area on the site.
|
|

|
6.
|
Site Engineering
|
|
Design site to accommodate drainage, traffic patterns
and utility hookups.
|
|

|
7.
|
Foundation Plan
|
|
Design the foundation to accommodate the building super
structure and any special equipment loads.
|
|

|
8.
|
Structural Design
|
|
Design an appropriate structural system to meet the
functional need of the customer.
|
|

|
9.
|
Floor Plans
|
|
Convert the space needs into a floor plan.
|
|

|
10.
|
Elevations
|
|
Design the exterior appearance of the building.
|
|

|
11.
|
Wall Cross Sections & Details
|
|
Design how the building components are assembled.
|
|

|
12.
|
Finish Schedules
|
|
Design interior room finishes.
|
|

|
13.
|
Door & Window Schedules
|
|
Select proper windows, doors and hardware.
|
|

|
14.
|
Mechanical Design
|
|
Design appropriate mechanical, plumbing, heating,
ventilating and air conditioning systems to meet the Owner’s needs.
|
|

|
15.
|
Electrical Design
|
|
Design appropriate electrical service and select light
fixtures to meet the Owners needs.
|
|

|
16.
|
Fire Protection
|
|
Design appropriate fire protection system pending the
use of the facility.
|
|

|
17.
|
Preparation of Proposal & Contract Documents
|
|
Document all design requirements by division work into a
project proposal and Contract Documents.
|
|

|
18.
|
State and Local Plan Approval
|
|
Submit plans to Dept. of Industry, Labor & human
Relations and local authorities for review & approvals.
|
|

|
19.
|
Artist's Rendering
|
|
Create an artists colored rendering.
|
|

|
20.
|
Landscaping
|
|
Design the appropriate landscaping for the project.
|
|

|
21.
|
Special Engineering
|
|
Prepare the following special engineering required for
this project.
|
|

|
22.
|
Long
Range Planning
|
|
Analyze the facility requirements for an extended period
of years.
|
|

|
23.
|
Insurance Requirements
|
|
Owner is required to make Design/Builder aware of any
special conditions or requirements they may require. Owner is responsible for
purchasing a builders risk policy and naming Delta additionally insured.
|
|

|
24.
|
Financial Requirements
|
|
Anticipated date of Lender approval:
|
|

|
25.
|
ADA
/ TDLR
|
|
Review fee and compliance checks to be owners
responsibility unless checked.
|
|

|
26.
|
Other Services:
|
|
________________________________________________________
________________________________________________________
________________________________________________________
________________________________________________________
________________________________________________________
________________________________________________________
|
|
|
|
|
|
|